Turbo Expander Project Case Studies
Our case studies focus on the engineering decisions behind a turbo expander project: operating cases, interfaces, risks, design trade-offs, inspection and project execution.
What the machine had to achieve and across which operating cases.
The constraint that made the project more than a catalog selection.
How process, mechanical and package decisions were connected.
How inspection, testing and documentation supported project delivery.
This page is the central index for TIBOCN turbo expander and compander engineering case studies. Project information is published with commercially sensitive customer details removed where necessary. The goal is to show the technical reasoning and execution method without exposing confidential client data.

Featured Engineering Case Study
LPG Processing Compander Engineering Case Study: Multi-Case Design Review
This case examines a compander duty where the expander and compressor sides must be evaluated together across multiple operating cases. The engineering review considers process conditions, shaft-power balance, operating range and package implications rather than selecting the machine from one nominal point.
Case Study Categories
As additional project records are prepared for publication, this hub will group cases by application and project type so EPC engineers, plant operators and maintenance teams can find the closest technical reference quickly.
Air Separation / ASU
Turbo expander duties for cryogenic air-separation plants, including new equipment, service and replacement work.
Nitrogen Refrigeration
Expansion-machine selection for nitrogen refrigeration cycles with multiple design and operating cases.
Natural Gas / NGL / LPG
Compander and turbo expander applications where composition, phase behavior and power balance matter.
Replacement & Retrofit
Projects involving obsolete machines, interface verification, revised process duty and installation constraints.
Repair & Overhaul
Cases built around inspection findings, rotor / bearing condition, performance problems and maintenance decisions.
Spare Parts & Reconstruction
Engineering work where drawings, dimensions and service conditions are used to evaluate replacement components.
What a Useful Turbo Expander Case Study Should Show
A case study is most useful when it explains the engineering problem rather than only stating that equipment was delivered. For that reason, our technical case format emphasizes the information an engineer would need to understand why a particular solution was selected.
| Case Study Element | What We Explain |
|---|---|
| Project background | Application, plant context and the reason the project was initiated. |
| Operating cases | Design, normal, minimum / maximum or alternate process cases relevant to selection. |
| Engineering challenge | Process, rotor, interface, controls, reliability or schedule constraint. |
| Technical solution | How the equipment configuration addressed the stated requirement. |
| Inspection / verification | Relevant manufacturing, inspection, FAT or documentation approach. |
| Lessons for similar projects | General engineering points that can be applied without disclosing customer-confidential information. |

Related Engineering Guides
Until a project-specific case is available for every application, the following technical guides provide deeper engineering background:
- Turbo Expander for Natural Gas and NGL Recovery: Process and Selection Guide
- Turbo Expander in a Nitrogen Refrigeration Cycle
- How a Turbo Expander Works in a Cryogenic Air Separation Unit
- Replacing an Obsolete Turboexpander: Process and Interface Checklist
- When Should a Turboexpander Be Overhauled?
Confidentiality and Published Project Data
Many industrial gas, oil & gas and EPC projects include confidential customer information. Where a project cannot be named publicly, we may remove customer identity, exact site location, serial numbers or commercially sensitive values while retaining the engineering relationships that make the case useful. This is preferable to inventing generic “success stories” with no technical evidence.
Discuss a Similar Project
If one of the application categories above is close to your project, submit your process datasheet, existing equipment details or RFQ package. We can compare the technical scope with relevant experience and identify the additional information needed for a proposal.
Related capability pages: Manufacturing & Testing · Inspection & FAT · Replacement & Retrofit · Spare Parts
Browse Project References by Application
Natural Gas / Oilfield
CNPC Xinjiang 7.1 MPa
ENN Group 54,200 Nm³/h
Sinopec Xibei 46,887 Nm³/h
Dagang Oilfield
Daqing Oilfield
Hydrocarbon / Mixed Gas
Detailed Published Reference Cases
The following mini case studies use project-specific values from TIBOCN’s published reference list. Each page separates what the brochure actually confirms from the engineering information that would still be required for a new project.
High-Pressure Natural Gas — 27,500 Nm³/h at 7.1 MPa
CNPC Xinjiang Oilfield reference, 7.1 → 1.9 MPa, 43,000 rpm.
Large-Flow ASU — 201,975 Nm³/h Air
Sichuan Qiaoyuan Gas reference, 7.271 → 0.54 MPa, 15,400 rpm.
Ethane Expander — 62,278 kg/h at 6.95 MPa
CNPC Xinjiang Oilfield reference for ethane service.
Nitrogen Expander — 62,500 Nm³/h at 5.49 MPa
Sichuan Qiaoyuan nitrogen-expander reference.
Natural Gas — 54,200 Nm³/h for ENN Group
Published ENN Group natural-gas reference, 5.0 → 2.3 MPa.
NG + CO — 40,580 Nm³/h at Turpan-Hami Oilfield
CNPC Turpan-Hami Oilfield mixed-gas reference.
Additional Published Reference Cases
Pakistan Air Expander — 13,000 Nm³/h at 5.756 MPa
Published EC636B overseas air-expander reference.
Middle East Air Expander — 36,350 Nm³/h at 3.86 MPa
Published EC645 Middle East air-expander reference.
Linde Nitrogen Expander — 13,960 Nm³/h
Published EC633 nitrogen-expander reference.
Sinopec Xibei Natural Gas — 46,887 Nm³/h
Published EC650 natural-gas turbo expander reference.
Dagang Oilfield — 27,122 kg/h at 7.04 MPa
Published EC532 natural-gas reference with mass-flow data.
Daqing Oilfield — 19,145.9 kg/h
Published EC533 natural-gas turbo expander reference.
Selected Published Turbo Expander Project Data
The following examples are taken from TIBOCN company brochures and reference lists. They are useful as evidence of the range of applications previously engineered, but they are not standard catalogue ratings or guarantees for a new project. A new machine is selected from the actual working fluid, operating envelope and project requirements.
ASU Pressure-Energy Recovery
Medium: Air
Flow: 52,830 Nm³/h
Inlet / outlet pressure: 5.08 / 0.695 MPa(G)
Inlet temperature: -90.15°C
Expander speed: 25,000 rpm
Recovered power: 1,153 kW
Arrangement: Single-stage horizontal generator-turbo expander
Natural Gas Gate-Station Energy Recovery
Medium: Natural gas
Flow: 15,000 Nm³/h
Inlet / outlet pressure: 4.0 / 1.6 MPa(G)
Inlet temperature: 20°C
Expander speed: 25,000 rpm
Recovered power: 200 kW
Arrangement: Single-stage horizontal generator-turbo expander
Hydrogen-Peroxide Tail-Gas Power Recovery
Medium: Air + aromatics
Flow: 24,000 Nm³/h
Inlet / outlet pressure: 0.28 / 0.03 MPa
Inlet temperature: 38°C
Generating capacity: approximately 250 kW
High-Pressure Natural Gas Expander
Medium: Natural gas
Flow: 27,500 Nm³/h
Inlet / outlet pressure: 7.1 / 1.9 MPa
Speed: 43,000 rpm
Loading: Booster-brake configuration
Source: published project reference list
Large-Flow Air Separation Reference
One published ASU reference lists an air turbo expander at 176,500 Nm³/h, with inlet pressure of 3.17 MPa, outlet pressure of 0.54 MPa and operating speed of 18,800 rpm. The reference list records a booster-brake configuration. This example is useful when evaluating whether TIBOCN has experience beyond small laboratory or pilot-scale machines.
Additional Published Reference List
The broader company reference list also documents the following duties across natural gas, air-separation and nitrogen applications:
| Client / Location | Medium | Flow | Inlet / Outlet Pressure | Speed |
|---|---|---|---|---|
| ENN Group | Natural gas | 54,200 Nm³/h | 5.0 / 2.3 MPa | 33,000 rpm |
| Xibei Oilfield (Sinopec) | Natural gas | 46,887 Nm³/h | 3.0 / 0.9 MPa | 29,980 rpm |
| Xinjiang Oilfield (CNPC) | Natural gas | 27,500 Nm³/h | 7.1 / 1.9 MPa | 43,000 rpm |
| Sichuan Qiaoyuan Gas | Air | 201,975 Nm³/h | 7.271 / 0.54 MPa | 15,400 rpm |
| Linde project | Nitrogen | 13,960 Nm³/h | 4.12 / 0.41 MPa | 43,100 rpm |
| Anyang Iron & Steel | Nitrogen | 27,500 Nm³/h | 4.0 / 1.57 MPa | 32,600 rpm |
| Pakistan project | Air | 13,000 Nm³/h | 5.756 / 0.577 MPa | 47,500 rpm |
| Middle East project | Air | 36,350 Nm³/h | 3.86 / 0.546 MPa | 29,300 rpm |
Source: TIBOCN published company reference list. Values are historical project references and should not be interpreted as a standard performance guarantee for a new duty.
How to Compare Your Project with These References
A similar flow or pressure does not automatically mean the same machine can be reused. For a meaningful comparison, match the working fluid, molecular weight / composition, pressure ratio, inlet temperature, flow range, required refrigeration or shaft power, bearing arrangement, speed range and package interfaces. For that reason, TIBOCN uses published references as engineering evidence rather than as a substitute for project-specific selection.
Related: Turbo Expander Design & Engineering · Turbo Expander Manufacturer · Natural Gas / NGL Turbo Expander
Retrofit Reference Outcomes
TIBOCN’s technical references describe two retrofit examples. These are reported technical reference results, not independently verified performance guarantees. Detailed test conditions, complete operating records and acceptance documents should be requested when a comparable duty is under review.
1300 TPD-Class Air Separation Retrofit
For a 1300 TPD-class cryogenic expander application, the published technical reference describes replacing a compressor-end plug-in unit and achieving 1380 TPD liquid production after modification. The statement identifies the plant class and reported post-modification result; it does not establish a documented 1300 TPD measured baseline.
Impeller Replacement and Efficiency Recovery
In a separately described turbine-end impeller replacement, the reported operating efficiency changed from 88.0% to 88.48%, approaching a quoted 88.5% design efficiency. This is an improvement of 0.48 percentage points, under the reported operating conditions.
For a buyer’s comparison: request original design and actual pre/post process data, measurement method, contractual guarantees, rotor/bearing work scope and test records. Results from another process or expander should not be extrapolated to a new project.
For replacement feasibility and required information, see Turbo Expander Replacement & Retrofit.
Have a turbo expander, compander or replacement RFQ?
Send the technical package and operating cases for review.