Turbo Expander Project Case Studies

Our case studies focus on the engineering decisions behind a turbo expander project: operating cases, interfaces, risks, design trade-offs, inspection and project execution.

Process Duty
What the machine had to achieve and across which operating cases.
Engineering Challenge
The constraint that made the project more than a catalog selection.
Solution Basis
How process, mechanical and package decisions were connected.
Verification
How inspection, testing and documentation supported project delivery.

This page is the central index for TIBOCN turbo expander and compander engineering case studies. Project information is published with commercially sensitive customer details removed where necessary. The goal is to show the technical reasoning and execution method without exposing confidential client data.

TIBOCN turbo expander package with piping and instrumentation used for project case studies
TIBOCN turbo expander package during factory assembly and integration.

Featured Engineering Case Study

LPG Processing Compander Engineering Case Study: Multi-Case Design Review

This case examines a compander duty where the expander and compressor sides must be evaluated together across multiple operating cases. The engineering review considers process conditions, shaft-power balance, operating range and package implications rather than selecting the machine from one nominal point.

Read the LPG Processing Compander Case Study →

Case Study Categories

As additional project records are prepared for publication, this hub will group cases by application and project type so EPC engineers, plant operators and maintenance teams can find the closest technical reference quickly.

Air Separation / ASU

Turbo expander duties for cryogenic air-separation plants, including new equipment, service and replacement work.

Nitrogen Refrigeration

Expansion-machine selection for nitrogen refrigeration cycles with multiple design and operating cases.

Natural Gas / NGL / LPG

Compander and turbo expander applications where composition, phase behavior and power balance matter.

Replacement & Retrofit

Projects involving obsolete machines, interface verification, revised process duty and installation constraints.

Repair & Overhaul

Cases built around inspection findings, rotor / bearing condition, performance problems and maintenance decisions.

Spare Parts & Reconstruction

Engineering work where drawings, dimensions and service conditions are used to evaluate replacement components.

What a Useful Turbo Expander Case Study Should Show

A case study is most useful when it explains the engineering problem rather than only stating that equipment was delivered. For that reason, our technical case format emphasizes the information an engineer would need to understand why a particular solution was selected.

Case Study ElementWhat We Explain
Project backgroundApplication, plant context and the reason the project was initiated.
Operating casesDesign, normal, minimum / maximum or alternate process cases relevant to selection.
Engineering challengeProcess, rotor, interface, controls, reliability or schedule constraint.
Technical solutionHow the equipment configuration addressed the stated requirement.
Inspection / verificationRelevant manufacturing, inspection, FAT or documentation approach.
Lessons for similar projectsGeneral engineering points that can be applied without disclosing customer-confidential information.
TIBOCN industrial production workshop for turbo expander project execution
TIBOCN industrial production workshop supporting equipment manufacturing and project execution.

Related Engineering Guides

Until a project-specific case is available for every application, the following technical guides provide deeper engineering background:

Confidentiality and Published Project Data

Many industrial gas, oil & gas and EPC projects include confidential customer information. Where a project cannot be named publicly, we may remove customer identity, exact site location, serial numbers or commercially sensitive values while retaining the engineering relationships that make the case useful. This is preferable to inventing generic “success stories” with no technical evidence.

Discuss a Similar Project

If one of the application categories above is close to your project, submit your process datasheet, existing equipment details or RFQ package. We can compare the technical scope with relevant experience and identify the additional information needed for a proposal.

Related capability pages: Manufacturing & Testing · Inspection & FAT · Replacement & Retrofit · Spare Parts

Browse Project References by Application

Detailed Published Reference Cases

The following mini case studies use project-specific values from TIBOCN’s published reference list. Each page separates what the brochure actually confirms from the engineering information that would still be required for a new project.

High-Pressure Natural Gas — 27,500 Nm³/h at 7.1 MPa

CNPC Xinjiang Oilfield reference, 7.1 → 1.9 MPa, 43,000 rpm.

Large-Flow ASU — 201,975 Nm³/h Air

Sichuan Qiaoyuan Gas reference, 7.271 → 0.54 MPa, 15,400 rpm.

Ethane Expander — 62,278 kg/h at 6.95 MPa

CNPC Xinjiang Oilfield reference for ethane service.

Nitrogen Expander — 62,500 Nm³/h at 5.49 MPa

Sichuan Qiaoyuan nitrogen-expander reference.

Natural Gas — 54,200 Nm³/h for ENN Group

Published ENN Group natural-gas reference, 5.0 → 2.3 MPa.

NG + CO — 40,580 Nm³/h at Turpan-Hami Oilfield

CNPC Turpan-Hami Oilfield mixed-gas reference.

Additional Published Reference Cases

Pakistan Air Expander — 13,000 Nm³/h at 5.756 MPa

Published EC636B overseas air-expander reference.

Middle East Air Expander — 36,350 Nm³/h at 3.86 MPa

Published EC645 Middle East air-expander reference.

Linde Nitrogen Expander — 13,960 Nm³/h

Published EC633 nitrogen-expander reference.

Sinopec Xibei Natural Gas — 46,887 Nm³/h

Published EC650 natural-gas turbo expander reference.

Dagang Oilfield — 27,122 kg/h at 7.04 MPa

Published EC532 natural-gas reference with mass-flow data.

Daqing Oilfield — 19,145.9 kg/h

Published EC533 natural-gas turbo expander reference.

Selected Published Turbo Expander Project Data

The following examples are taken from TIBOCN company brochures and reference lists. They are useful as evidence of the range of applications previously engineered, but they are not standard catalogue ratings or guarantees for a new project. A new machine is selected from the actual working fluid, operating envelope and project requirements.

ASU Pressure-Energy Recovery

Medium: Air
Flow: 52,830 Nm³/h
Inlet / outlet pressure: 5.08 / 0.695 MPa(G)
Inlet temperature: -90.15°C
Expander speed: 25,000 rpm
Recovered power: 1,153 kW
Arrangement: Single-stage horizontal generator-turbo expander

Natural Gas Gate-Station Energy Recovery

Medium: Natural gas
Flow: 15,000 Nm³/h
Inlet / outlet pressure: 4.0 / 1.6 MPa(G)
Inlet temperature: 20°C
Expander speed: 25,000 rpm
Recovered power: 200 kW
Arrangement: Single-stage horizontal generator-turbo expander

Hydrogen-Peroxide Tail-Gas Power Recovery

Medium: Air + aromatics
Flow: 24,000 Nm³/h
Inlet / outlet pressure: 0.28 / 0.03 MPa
Inlet temperature: 38°C
Generating capacity: approximately 250 kW

High-Pressure Natural Gas Expander

Medium: Natural gas
Flow: 27,500 Nm³/h
Inlet / outlet pressure: 7.1 / 1.9 MPa
Speed: 43,000 rpm
Loading: Booster-brake configuration
Source: published project reference list

Large-Flow Air Separation Reference

One published ASU reference lists an air turbo expander at 176,500 Nm³/h, with inlet pressure of 3.17 MPa, outlet pressure of 0.54 MPa and operating speed of 18,800 rpm. The reference list records a booster-brake configuration. This example is useful when evaluating whether TIBOCN has experience beyond small laboratory or pilot-scale machines.

Additional Published Reference List

The broader company reference list also documents the following duties across natural gas, air-separation and nitrogen applications:

Client / LocationMediumFlowInlet / Outlet PressureSpeed
ENN GroupNatural gas54,200 Nm³/h5.0 / 2.3 MPa33,000 rpm
Xibei Oilfield (Sinopec)Natural gas46,887 Nm³/h3.0 / 0.9 MPa29,980 rpm
Xinjiang Oilfield (CNPC)Natural gas27,500 Nm³/h7.1 / 1.9 MPa43,000 rpm
Sichuan Qiaoyuan GasAir201,975 Nm³/h7.271 / 0.54 MPa15,400 rpm
Linde projectNitrogen13,960 Nm³/h4.12 / 0.41 MPa43,100 rpm
Anyang Iron & SteelNitrogen27,500 Nm³/h4.0 / 1.57 MPa32,600 rpm
Pakistan projectAir13,000 Nm³/h5.756 / 0.577 MPa47,500 rpm
Middle East projectAir36,350 Nm³/h3.86 / 0.546 MPa29,300 rpm

Source: TIBOCN published company reference list. Values are historical project references and should not be interpreted as a standard performance guarantee for a new duty.

How to Compare Your Project with These References

A similar flow or pressure does not automatically mean the same machine can be reused. For a meaningful comparison, match the working fluid, molecular weight / composition, pressure ratio, inlet temperature, flow range, required refrigeration or shaft power, bearing arrangement, speed range and package interfaces. For that reason, TIBOCN uses published references as engineering evidence rather than as a substitute for project-specific selection.

Related: Turbo Expander Design & Engineering · Turbo Expander Manufacturer · Natural Gas / NGL Turbo Expander

Retrofit Reference Outcomes

TIBOCN’s technical references describe two retrofit examples. These are reported technical reference results, not independently verified performance guarantees. Detailed test conditions, complete operating records and acceptance documents should be requested when a comparable duty is under review.

1300 TPD-Class Air Separation Retrofit

For a 1300 TPD-class cryogenic expander application, the published technical reference describes replacing a compressor-end plug-in unit and achieving 1380 TPD liquid production after modification. The statement identifies the plant class and reported post-modification result; it does not establish a documented 1300 TPD measured baseline.

Impeller Replacement and Efficiency Recovery

In a separately described turbine-end impeller replacement, the reported operating efficiency changed from 88.0% to 88.48%, approaching a quoted 88.5% design efficiency. This is an improvement of 0.48 percentage points, under the reported operating conditions.

For a buyer’s comparison: request original design and actual pre/post process data, measurement method, contractual guarantees, rotor/bearing work scope and test records. Results from another process or expander should not be extrapolated to a new project.

For replacement feasibility and required information, see Turbo Expander Replacement & Retrofit.