Published reference case: TIBOCN’s company reference list records project code EC533 for the Daqing Oilfield Branch of CNPC. The working medium is natural gas.

ApplicationNatural Gas / Oilfield
MediumNatural gas
Flow19,145.9 kg/h
Pressure2.74 → 1.4 MPa
Speed26,760 rpm

Image note: the featured image is a representative TIBOCN workshop / equipment image and is not necessarily a photograph from this specific historical project.

Published Project Data

Project codeEC533
Client / locationDaqing Oilfield Branch of CNPC
Working mediumNatural gas
Flow19,145.9 kg/h
Inlet pressure2.74 MPa
Outlet pressure1.4 MPa
Published drive-side efficiency85%
Published load-side efficiency81%
BearingOil bearing
Speed26,760 rpm
Brake typeC — booster brake, according to the brochure note

What the Published Reference Confirms

The published list confirms this natural-gas turbo expander reference for Daqing Oilfield and records the flow in kg/h together with the listed pressure conditions, efficiencies, bearing type and rotational speed.

The brochure does not state the full gas analysis, process objective, inlet-temperature unit, compressor-side duty, control system or package-interface requirements. Those details are not added to this summary.

Engineering Context — General Guidance

For a new oilfield-gas turbo expander, the historical reference can support supplier-experience assessment, but the new design should be based on current composition, mass-flow range, inlet temperature, required outlet pressure, phase behavior, shaft-power balance, turndown and site requirements.

Have a similar turbo expander project?
Send the process datasheet, operating cases and existing-equipment information for technical review.

Send RFQ / Project Data →

Related TIBOCN Pages

See Natural Gas Processing & NGL Turbo Expander, Natural Gas / NGL Selection Guide and Project Case Studies.

Source note: project-specific values above are taken from TIBOCN’s published reference list.