Published reference case: TIBOCN’s company reference list records project code EC533 for the Daqing Oilfield Branch of CNPC. The working medium is natural gas.
Image note: the featured image is a representative TIBOCN workshop / equipment image and is not necessarily a photograph from this specific historical project.
Published Project Data
| Project code | EC533 |
|---|---|
| Client / location | Daqing Oilfield Branch of CNPC |
| Working medium | Natural gas |
| Flow | 19,145.9 kg/h |
| Inlet pressure | 2.74 MPa |
| Outlet pressure | 1.4 MPa |
| Published drive-side efficiency | 85% |
| Published load-side efficiency | 81% |
| Bearing | Oil bearing |
| Speed | 26,760 rpm |
| Brake type | C — booster brake, according to the brochure note |
What the Published Reference Confirms
The published list confirms this natural-gas turbo expander reference for Daqing Oilfield and records the flow in kg/h together with the listed pressure conditions, efficiencies, bearing type and rotational speed.
The brochure does not state the full gas analysis, process objective, inlet-temperature unit, compressor-side duty, control system or package-interface requirements. Those details are not added to this summary.
Engineering Context — General Guidance
For a new oilfield-gas turbo expander, the historical reference can support supplier-experience assessment, but the new design should be based on current composition, mass-flow range, inlet temperature, required outlet pressure, phase behavior, shaft-power balance, turndown and site requirements.
Have a similar turbo expander project?
Send the process datasheet, operating cases and existing-equipment information for technical review.
Related TIBOCN Pages
See Natural Gas Processing & NGL Turbo Expander, Natural Gas / NGL Selection Guide and Project Case Studies.
Source note: project-specific values above are taken from TIBOCN’s published reference list.



