Published reference case: TIBOCN’s reference list records project code EC532 for the Dagang Oilfield Branch of CNPC. The working medium is natural gas.

ApplicationNatural Gas / Oilfield
MediumNatural gas
Flow27,122 kg/h
Pressure7.04 → 3.1 MPa
Speed27,440 rpm

Image note: the featured image is a representative TIBOCN workshop / equipment image and is not necessarily a photograph from this specific historical project.

Published Project Data

Project codeEC532
Client / locationDagang Oilfield Branch of CNPC
Working mediumNatural gas
Flow27,122 kg/h
Inlet pressure7.04 MPa
Outlet pressure3.1 MPa
Published drive-side efficiency83%
Published load-side efficiency77%
BearingOil bearing
Speed27,440 rpm
Brake typeC — booster brake, according to the brochure note

What the Published Reference Confirms

The brochure supports a high-pressure natural-gas turbo expander reference for Dagang Oilfield and explicitly lists the flow in kg/h, not Nm³/h. That unit distinction is preserved here.

The reference does not provide gas composition, the inlet-temperature unit, process recovery target, package interfaces, control philosophy or compressor-side details. Those points remain unsupported by the source.

Engineering Context — General Guidance

For new natural-gas duties quoted on a mass-flow basis, the full gas composition is especially important because volumetric flow, density and aerodynamic conditions depend on composition and thermodynamic state. Final design should therefore use the complete customer datasheet and all operating cases rather than converting this historical reference into a nominal model rating.

Have a similar turbo expander project?
Send the process datasheet, operating cases and existing-equipment information for technical review.

Send RFQ / Project Data →

Related TIBOCN Pages

See Natural Gas Processing & NGL Turbo Expander, Turbo Expander RFQ Checklist and Project Case Studies.

Source note: all historical project figures above come from TIBOCN’s published company reference list.